Skip to main content

Layang Layang Flying Academy

Licences & Ratings

How Long Does Commercial Pilot Licence with Instrument Rating Training Take in Malaysia?

14 August 2026 · 3 min read

“How long will it take?” is usually the second question after “what does it cost?”. For a Commercial Pilot Licence with Instrument Rating and Frozen Airline Transport Pilot Licence at LLFA the published indicative duration is 18 to 24 months — but the honest answer is more useful than the headline number.

What the 18–24 months covers

The published structure is 850 hours of ground school and 200 hours of flying, sequenced across five phases: ground school, single-engine flying, instrument flying, multi-engine operations and upset prevention and recovery.

That is a full-time commitment. It is not a course you fit around a job.

Why the range is a range

Weather

Malaysia’s tropical climate produces convective activity that can stop flying for part of a day. Schools plan around it, but across a two-year programme weather moves the calendar. This is true of every flying school in every country.

Your own progress

Students do not learn at identical rates. Some need extra circuits before first solo; others find instrument flying takes longer to click. Additional sorties are normal, not a failure — but they add time.

Examination scheduling

Theoretical examinations sit on the authority’s calendar, not yours. A resit means waiting for the next sitting.

Medical and documentation

Delays here happen before the clock starts, and they are the most avoidable. See our entry requirements guide.

Aircraft availability

Fleet size, maintenance and instructor availability all shape how many sorties a week you can actually fly. LLFA is part of the Layang Layang Aerospace group with engineering on site, which helps keep aircraft on line.

A realistic month-by-month shape

Every student’s path differs, but the programme generally moves like this:

  • Early months — heavy ground school, first flights, circuits, first solo
  • Middle period — navigation, cross-country flying, Airline Transport Pilot Licence (ATPL) examinations progressing in parallel
  • Later months — instrument flying in the simulator and aircraft, multi-engine operations on the DA42
  • Final phase — upset prevention and recovery, consolidation and final checks

Before and after the programme

Budget time either side of the 18–24 months:

  • Before: medical, documents, Civil Aviation Authority of Malaysia (CAAM) portal approval and financing — allow a few months
  • After: licence issue administration, and then the separate matter of building hours towards employment

So from first serious enquiry to holding a professional licence, a realistic planning horizon is around two to two and a half years.

Can it be done faster?

Not meaningfully, and you should be wary of anyone promising otherwise. The hours are published, the examinations are scheduled by the authority, and skills built too quickly do not hold. What you can control is not losing time: complete your medical early, keep ground school ahead of your flying, attend consistently, and have financing settled before you start.

What makes it take longer

In our experience the causes are consistent — falling behind in theory, inconsistent attendance (flying skills decay quickly with gaps), financing arranged late, and documentation started late. None of these are about aptitude.

See the full Commercial Pilot Licence with Instrument Rating (CPL/IR) programme structure or ask Admissions about the next intake. Durations are indicative and subject to LLFA confirmation, the approved syllabus and applicable CAAM requirements.